CORE 9-27-12 Minutes

By Kate Stephenson, Executive Director
CORE 9-27-12Thursday, September 27, 20128:24 AMHypothesis:1.       Add Semester Program on Campus full timea.       Needs to be full time to work financially2.       Add Semester Program Off Campusa.       This is the current status and it should remain until we have an improved enrollment.3.       Eliminate or Backburner Semester ProgramKathy...

Read this post >

Draft Design Guidelines 8.7.12

By Kate Stephenson, Executive Director
We are heading back to meet with the Waitsfield Design Review Board for preliminary master plan review again on August 14th. We've submitted three updated documents: 1) Draft Design Guidelines2) Program by Phase3) Site Plan by PhaseSee below for these documents. Yestermorrow Building Design Guidelines – Draft 8.6.12IntroductionThe overall master...

Read this post >

Master Planning Update 07.25.12

By Kate Stephenson, Executive Director
The Core Team has been busy at work the past six months preparing for a second presentation to the Waitsfield Development Review Board (DRB) on Tuesday, July 24, 2012. This meeting is a follow-up to the January 24, 2012 meeting in which Yestermorrow presented to the DRB a sketch plan for adaptive redevelopment (minutes from this meeting can be...

Read this post >

Campus Master Plan Overview

By Kate Stephenson, Executive Director
Yestermorrow's next step in the master planning design process is to go through a Preliminary Plan Review with the Waitsfield Development Review Board (DRB). A meeting is scheduled for today, July 24, 2012. In preparation for this meeting, Yestermorrow submitted the project description shown below to the DRB. The description, which was formulated...

Read this post >

Core Team Minutes 07.16.12

By Kate Stephenson, Executive Director
Monday, July 16, 2012  Attendees: John Connell, Kinny Perot, Robin Morris, Kate Stephenson, Abby Martin, Kelly Ogrodnik1.       DRB Application Review Meeting  a. Tuesday, July 24, 2012; 7pm  at the Town Hallb. Attendance - Robin, Kate, Kin, Peter Lazorchak, Andres,  JBC (currently in conflict)c. Review Plan - Kate...