Master Plan Blog

Core Team notes 11/3/14

By Kate Stephenson, Executive Director
11/3/14 CORE Team NotesAttending: Kinny Perot, Kate Stephenson, Elizabeth Courtney, Peter LazorchakBy Phone: John ConnellPeter Lazorchak gave us an update on what he’s been working on in terms of the wastewater design process. He touched base with Pete Munoz about system size and construction cost. The basic parameters they use to calculate cost...

Read this post >

Core Team notes 10-3-14

By Kate Stephenson, Executive Director
CORE 10-1-14Friday, October 03, 20149:00 AM9:10    Discuss the Lazorchak Dilemmao    Moving to Wilcox...

Read this post >

Current Documents

By Kate Stephenson, Executive Director
This is intended as a resource for Yestermorrow students and instructors using the Yestermorrow campus as a site for design projects. It includes links to current site plans, maps, and supplemental material relevant to the development of the campus and will be continually updated as new versions become available. Plans currently approved by...

Read this post >

Stormwater/Wastewater Coordination

By Kate Stephenson, Executive Director
Hi folks,Just a few updates from my meeting today with Peter Lazorchak and Andres Torizzo to talk about the coordination of stormwater and wastewater design and permitting…We reviewed general timeline of working on these designs and permitting between now and September, then moving into Act 250 permitting over the winter, with the goal being that...

Read this post >

Pages